|
Architect: Sheril Castelino
Construction: Giorgio Luciani
Area: 65 sqm
Cost: Rs.6 lacs
Period: 2005/6
This building houses a multipurpose hall and services for 60 workers (kitchen, laundry, lockers, bathrooms etc.) of the existing factory. The services are contained within closed rooms and the hall is left completely open on two sides for maximum cross ventilation and feeling of space at congregations. The hall is also marked by a curvilinear wall on one side and the linear block of services on the other. The roof is lifted from the building to provide a natural draft of air circulation in the room.
A small bas–relief design on the ceiling animates the space otherwise left bare. Leftover blue metal aggregate of the site with locally found boulders in conjunction with local species of the plants dot the green area around the building. Textured exterior wall paint in shades of orange add to the tropical context.
|